Location: Čakovec
”Levačić” tinsmith production facility is a hall (18,4×65,4 meters) with an indoor annex (floor) of 18,4×32,5 meters and a roof with a 10% pitch. The facility is built with pefabricated prestressed reinforced-concrete elements, and it has a crane with a bearing capacity of 12,5 tonnes. The total gross building area is approximately 1.800 m2.
Associates: ŠIRBEGOVIĆ INŽENJERING d.o.o. – Gračanica