“Cian” Industrial Building – detailed design

Location:  Šibenik

We made a detailed design project of prefabricated elements for a building with the purpose of storeing hazardous and non-hazardous waste. The main roof beam has a span of 25 meters. The total gross area of the building is approx. 2.700 m2.

Associate: Bruno Tudor, mag. ing. aedif.